videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the "five water treatment" "357" timetables "for three years to resolve outstanding issues, obviously worked," victory of the year. The County's departments at all levels must firmly establish the "guanghui is gold and silver" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well "five water treatment of" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will "river water quality improved at the county level, up to five" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, "clear rivers" reaching the County created. Organization "look back" special inspection, the County garbage River, black and odorous River is "Dragnet" investigation, timely
rectification of problems found in place firmly to prevent river pollution rebound. In accordance with the "one-stop strategy", improving the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of "clear rivers" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve "effluent from sewage treatment rate, running accuracy, compliance" requirement, speed up the town's support network construction, is focusing on nanotubes home "last meters" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which
fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the "Sun" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to "dig up mud", as the deepening water of this year's "plays". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the "one river one policy" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud "way out", according to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of
backward production capacity, increase the intensity of
为了促进本公司各项经营活动由事后管理向事前管理方式的转变,强化生产经营全过程控制,提高资金使用的计划性,特制定本管理办法,以增加公司资金运行的透明度,降低各项成本,使有限的资金发挥最大的效能。
rope tube protection. (3) position of the switch box must be placed correctly, prohibit reveParts are not allowed direct contact with the ground, made of impermeable material at the bottom pad 100mm. D, packing and transport for all materials are used to make decorative uses, so all of the company's factory finished and semi-finished products are imported protective tape to protect the surface of the material, so as not to damage surface during transport, Setup, and then transported by fibrous bands or packed in to the scene. After the materials delivered to the site, special protection and builders around careful coordination. All materials delivered to the site, where are placed in a ventilated shelter. 8, on-site installation of technical control and schedule control of personnel's quality and technology is an important factor in determining quality. Our installers are professionally trained skilled workers, the company doing the engineering exercise trained a number of technical standards high, strong operational skills of the construction team, has accumulated rich experience in construction. For this project, selected the best personnel and equipped with Advanced installation techniques and equipment. Before the approach, by relevant leaders on the importance of this project, so that installers have enough awareness by technicians on the relevant standard specifications and safety guidelines all technology to Builder gives the low-down.
treatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation "three years action plans", requirements to December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project "Trinity"
environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross Yang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorously
implementation "strong library" "solid di" "spread row" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play "three to split" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the "three to split" operation time is over three years, but "three to split" must continue to catch on, and resolve a split cannot be changed. All localities and
departments to the village and "no unauthorised" created
图 4
六、让数据按需排序
如果你要将员工按其所在的部门进行排序,这些部门名称既的有关信息不是
按拼音顺序,也不是按笔画顺序,怎么办?可采用自定义序列来排序。
1.执行“格式→选项”命令,打开“选项”对话框,进入“自定义序列”标
签中,在“输入序列”下面的方框中输入部门排序的序列(如“机关,车队,一车
间,二车间,三车间”等),单击“添加”和“确定”按钮退出。
2.选中“部门”列中任意一个单元格,执行“数据→排序”命令,打开“排
序”对话框,单击“选项”按钮,弹出“排序选项”对话框(如图 5),按其中
的下拉按钮,选中刚才自定义的序列,按两次“确定”按钮返回,所有数据就按
要求进行了排序。
图 5
七、把数据彻底隐藏起来
工作表部分单元格中的内容不想让浏览者查阅,只好将它隐藏起来了。
1.选中需要隐藏内容的单元格(区域),执行“格式→单元格”命令,打开