GM WORLDWIDE ENGINEERING STANDARDS
Template For ENG STDS
GMW3172
GM Confidential
© Copyright 2018 General Motors Company All Rights Reserved
April 2018
Page 18 of 120
• Project Manager (optional)
4.2.3 Analytical Activities. The supplier shall conduct Analytical Activities and provide the analytical models
and assumptions according to the approved GMW3172 Component Environmental Test Plan (CG3043). Each
analytical result shall be reported to the GM CVE, GMW3172 ENV SME, and DRE for evaluation and approval.
4.2.4 Development Activities. The supplier shall conduct Development Activities and provide test samples to
GM (may include pre and post test samples) according to the approved GMW3172 Component Environmental
Test Plan (CG3043). Each test result shall be reported to the GM CVE, GMW3172 ENV SME, and DRE for
evaluation and approval.
Components that have failed during a test shall be analyzed immediately by the supplier. The supplier shall
contact the GM CVE (or GMW3172 ENV SME) immediately to define further actions. The component shall not
be repaired or further used in the Test Flow, unless approved by GM.
4.2.5 Design Validation Activities. The supplier shall conduct Design Validation (DV) and provide test samples
(may include pre and post test samples) to GM according to the approved GMW3172 Component Environmental
Test Plan (CG3043). Each test result shall be uploaded in CEMENT for approval.
Components that have failed during a test shall be analyzed immediately by the supplier. The supplier shall
contact the GM CVE (or GMW3172 ENV SME) immediately to define further actions. The component shall not
be repaired or further used in the Test Flow, unless approved by GM.
4.2.6 Product Validation Activities. The supplier shall conduct Product Validation (PV) and provide test
samples (may include pre and post test samples) to GM according to the approved GMW3172 Component
Environmental Test Plan (CG3043). Each test result shall be uploaded in CEMENT for approval.
Components that have failed during a test shall be analyzed immediately by the supplier. The supplier shall
contact the GM CVE (or GMW3172 ENV SME) immediately to define further actions. The component shall not
be repaired or further used in the Test Flow, unless approved by GM.
4.3 Summary of A/D/V Activities. Table 5 is a default summary of A/D/V activities that shall be used for defining
tests that will be included in the GMW3172 Component Environmental Test Plan (CG3043) with GM approval.
The GM-approved GMW3172 Component Environmental Test Plan (CG3043) defines the required subset of
GMW3172 test procedures.
Table 5: Summary of A/D/V Activities
Activity Phase FSC Operating
Type
Continuous
Monitoring
Functional
Cycling
Test Setup and Component Verification
5-Point Functional/Parametric
Check
D, DV,
PV
2
A 2.1, 3.2
Yes N/A
1-Point Functional/Parametric
Check
D, DV,
PV
2
A 2.1, 3.2
Yes N/A
Continuous Monitoring
D, DV,
PV
2
N/A
As defined
in each test
Yes Yes
Functional Cycling
D, DV,
PV
2
N/A 2.1, 2.2, 3.1, 3.2
Yes Yes
Visual Inspection and Dissection
– Design Review Based on Test
Results (DRBTR)
D, DV,
PV
2
N/A 1.1
N/A N/A
Cross Section and Inspection
DV, PV
1
N/A 1.1
N/A N/A
Dimensional Check
DV, PV
2
N/A 1.1
N/A N/A