为解决复杂条件下特殊地段软岩巷道支护问题
,
特别是一些前期受采动影响和后期煤柱长期
作用下的大断面交岔点巷道
“
前
掘后修
”、
“
屡修
屡坏
”
的支护难题
,
基于许疃煤矿
-
500 m
水平轨道石
门交岔点巷道的工程实例
,
采用理论分析与数值模拟的方法
,
对大断面交岔点巷道低强度围岩的变形
影响因素
、
变形规律
、
差异化支护技术及其作用和支护效果进行了相关研究
,
创新性地提出了大断面
石门交岔点差异化的支护理念
、
设计方案及支护技术
。
工程实践表明
,
采用五大分区的差异化支护方
案后
,
支护结构的整体承载能力和围岩的自承能力得到提高
,
交岔点范围内两帮最大位移为
102 mm,
顶底板最大位移为
69 mm,
有效控制了特殊地段大断面交岔点巷道低强度围岩的大变形
、
强流变的失
稳问题
,
保证了巷道围岩的长期稳定
。
关键词
:
大断面交岔点
;
低强度软岩
;
差异化支护
;
顶帮底互控
中图分类号
: TD353
文献标志码
: A
文章编号
: 0253
-
2336( 2017) 02
-
0051
-
08
Study on differentiation support technology of intersection at
large cross section cross
-
cut
Wang Bo,Yang Zhangjie,Yang Yonggang,Yu Dajun
( Anhui Academy of Coal Science,Hefei 230001,China)
Abstract : In order to solve the support problem of the special section in the mine soft rock roadway under the complicated condition,specially
under the early mining influences and late coal pillar long role period,the support difficulties of the driving in front and repair in rear and re-
peated repair and repeated failure in the large cross section intersection,based on the engineering case of the crosscut intersection gateway in
-
500 m level track in Xutuan Mine,the theoretical analysis and the numerical simulation method were applied to the related study on the de-
formation influence factors,deformation law,differentiation support technology and role and the support effect of the low strong surrounding
rock in the large cross section intersection gateway. The differentiation support idea,design plan and support technology of the large cross
section crosscut intersection was provided in innovation. After the differentiation support plan of the five major zones ( expanded reinforce
support zone,steadily changed large cross section transition zone,pre
-
grouting reinforced zone,full cross section shotcreting,bolt,grouting
and roof and floor interactive control zone and the roof and sidewall shotcreting,anchoring and grouting and the floor grouting reinforced
zone)
,t
he completed loading capacity of the support structure and the self loading capacity of the surrounding rock were improved. The max
convergence of the two sidewalls within the intersection scope was 102 mm and the max convergence of the roof and floor was 69 mm. Thus
the large deformation and strong rheology instability problem of the low strength surrounding rock along the large cross section intersection
roadway was effectively controlled. The long period stability of the surrounding rock along the roadway was ensured.
Key words: large cross section intersection; low strength soft rock; differentiation support; roof and floor interactive control
收稿
日期
: 2016
-
07
-
11;
责任编辑
:
杨正凯
DOI: 10.13199 /j.cnki.cst.2017.02.009
基金项目
:
国家重点基础研究发展计划
( 973
计划
)
资助项目
( 2011CB201200)
作者简介
:
王 波
( 1982—) ,
男
,
山东泰安人
,
助理研究员
,
硕士
。Tel: 18326618517,E
-
mail: 54784616@ qq. com
引用格式
:
王 波
,
杨张杰
,
杨永刚
,
等
.
大断面石门交岔点差异化支护技术研究
[J].
煤炭科学技术
,2017,45( 2) : 51
-
58
.
Wang B o,Yang Zhangjie,Yang Yonggang,et al.Study on differentiation support technology of intersection at large cross section cross
-
cut[J].
Coal Science and Technology,2017,45( 2) : 51
-
58.
0
引 言
随着我国煤炭开采范围的扩大和开采深度的增
加
,
复杂
条件下特殊地段软岩巷道支护问题日益突
出
。
巷道交岔点是指矿井中巷道交会或分岔处的一
段巷道
[1]
,
交岔
点因受
2
条或多条相交巷道的影响
,
15