首页Bernese GPS Software Version 5.0
Data from eight European stations of the IGS Network are selected for the example campaign. They are listed in Table 1.1 to- gether with the receiver and antenna type and the antenna height. The locations of these stations are given in Figure 1.1.
资源详情
资源评论
资源推荐
Bernese GPS Software
Version 5.0
Tutorial
Processing Example
Introductory Course
Terminal Session
Rolf Dach, Urs Hugentobler,
Peter Walser
June 2009
AIUB
Astronomical Institute, University of Bern
Contents
1. Introduction to the Example Campaign 1
2. Terminal Session: Monday 3
2.1 Start the Menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.2 Select Current Session . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2.3 Campaign Setup . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
2.4 Input Files for the Processing Examples . . . . . . . . . . . . . . . . . . . . 7
2.4.1 Atmosphere files ATM . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.4.2 General files GEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.4.3 Orbit files ORB . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2.4.4 RINEX files ORX, OUT . . . . . . . . . . . . . . . . . . . . . . . . . 8
2.4.5 Station files STA . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2.5 Menu Variables . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2.6 Generate A priori Coordin ates . . . . . . . . . . . . . . . . . . . . . . . . . 11
2.7 Importing the Observations . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
2.8 Daily Goals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
3. Terminal Session: Tuesday 19
3.1 Prepare Pole Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
3.2 Generate Orbit Files . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
3.3 Data Preprocessing (I) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
3.3.1 Receiver Clo ck Synchronization . . . . . . . . . . . . . . . . . . . . 27
3.3.2 Form Baselines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
3.3.3 Preprocessing of the Phase Baseline Files . . . . . . . . . . . . . . 33
3.4 Daily Goals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37
Bernese GPS Software Version 5.0 Page I
Contents
4. Terminal Session: Wednes day 39
4.1 Data Preprocessing (II) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39
4.2 Make a First Network Solution . . . . . . . . . . . . . . . . . . . . . . . . . 47
4.3 Ambiguity Resolution (QIF) . . . . . . . . . . . . . . . . . . . . . . . . . . 50
4.4 Daily Goals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
5. Terminal Session: Thursday 63
5.1 Final Network Solution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
5.2 Check the Coordinates of the Fiducial Sites . . . . . . . . . . . . . . . . . . 69
5.3 Check the Daily Repeatability . . . . . . . . . . . . . . . . . . . . . . . . . 75
5.4 Compute the Final Solution of the Session . . . . . . . . . . . . . . . . . . 77
5.5 Velocity Estimation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
5.6 Daily Goals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
6. Terminal Session: Friday 89
6.1 Kinematic Positioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 89
6.2 Clock Estimation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94
6.3 Bernese Processing Engine . . . . . . . . . . . . . . . . . . . . . . . . . . . 103
Page II AIUB
1. Introduction to the Example Campaign
Data fr om eight European stations of the
IGS Network are selected for the example
campaign. They are listed in Table 1.1 to-
gether with the receiver and antenna type
and the antenna height. The locations of
these stations are given in Figure 1.1.
Three of these stations (MATE, ONSA, and
VILL) are IGS core sites. This is a set of
about 95 IGS stations representing the real-
ization of the reference frame (IGS 00: IGS
realization of the ITRF 2000).
Furtherm ore, two stations (FFMJ and
ZIMJ) are equipped with GNSS receivers
tracking GPS and GLONASS satellites. The
receiver antennas of only two sites (ONSA
and PTBB) are equ ipp ed with radomes (type OSOD resp. SNOW).
BRUS −
− FFMJ
− MATE
− ONSA
− PTBB
− VILL
ZIMM −
− ZIMJ
Figure 1.1: Stations used in example campaign
The receivers used at the stations BRUS and PTBB are conn ected to H-Maser clocks. The
receiver type ASHTECH Z-XII3T was developed for time and frequency applications.
The distances between neighboring stations are between 300 and 1200 km. Two GPS re-
ceivers in Zimmerwald are included into the example (ZIMM and ZIMJ, d istance 14 m).
The observations for these stations are available for four days . Two days in year 2002 (day
of year 143 and 144) and two in 2003 (days 138 and 139). In these terminal sessions you
will analyze the data in order to obtain a velocity field based on IGS final products.
The data belonging to this example campaign are included in the distribution. Therefore,
you may also use this document to repeat the generation of the solution at home to exercise
the use of the Bernese GPS Software.
Bernese GPS Software Version 5.0 Page 1
剩余109页未读,继续阅读
qq05030162228
- 粉丝: 0
- 资源: 5
上传资源 快速赚钱
- 我的内容管理 收起
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
会员权益专享
最新资源
- c++校园超市商品信息管理系统课程设计说明书(含源代码) (2).pdf
- 建筑供配电系统相关课件.pptx
- 企业管理规章制度及管理模式.doc
- vb打开摄像头.doc
- 云计算-可信计算中认证协议改进方案.pdf
- [详细完整版]单片机编程4.ppt
- c语言常用算法.pdf
- c++经典程序代码大全.pdf
- 单片机数字时钟资料.doc
- 11项目管理前沿1.0.pptx
- 基于ssm的“魅力”繁峙宣传网站的设计与实现论文.doc
- 智慧交通综合解决方案.pptx
- 建筑防潮设计-PowerPointPresentati.pptx
- SPC统计过程控制程序.pptx
- SPC统计方法基础知识.pptx
- MW全能培训汽轮机调节保安系统PPT教学课件.pptx
资源上传下载、课程学习等过程中有任何疑问或建议,欢迎提出宝贵意见哦~我们会及时处理!
点击此处反馈
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功
评论6