QUESTION NO: 1
The company you advise wants to carry out the material availability check automatically in the production
order at various points in time. Which of the following options would you recommend? (Choose two.)
A. Goods receipt for the product produced with the order
B. Creation of the production order
C. Confirmation of the operation that the materials being checked are assigned to
D. Release of the production order
E. Goods receipt for a missing part
Answer: B,D
QUESTION NO: 2
What repetitive manufacturing options can you use to carry out line loading in the SAP ECC system and
thus generate Run Schedule Quantities (RSQ) from normal planned orders?
(Choose three.)
A. Automatic selection of the production version in material requirements planning (MRP) using Selection
Methods setting.
B. Manual assignment of planned production quantities in a planning table.
C. Automatic selection of the production version by applying quota arrangement records in material
requirements planning (MRP).
D. Using a planning algorithm from capacity planning.
E. Selecting a suitable repetitive manufacturing profile that contains an option for automatic line selection.
Answer: A,B,C
QUESTION NO: 3
Which statements are true for ECC Long-Term Planning (LTP)? (Choose two.)
A. Reorder point planned materials can be included in long-term planning.
B. In case of external procurement, long-term planning creates purchase requisitions.
C. A planning scenario must be released to use it in long-term planning.
D. Long-term planning generally is operational planning of important components.
Answer: A,C
QUESTION NO: 4
Which of the following activities within the KANBAN procedure normally triggers subsequent stock posting
of the goods receipt?
A. Set Container in transport
B. Set Container in process
C. Set Container empty
D. Set Container full
Answer: D
QUESTION NO: 5
Which of the following elements do you have to prepare for costing of a production order to function
without errors? (Choose three.)
A. Assign costing variants to order type.
2 / 21
B. Propose a standard text key in work center.
C. Assign a production scheduling profile to the material master (product).
D. Enter formulas for costing in the work center.
E. Use an operation control key with the indicator costing-relevant.
Answer: A,D,E
QUESTION NO: 6
In which of the following objects can you activate backflushing of components if you want to use this
functionality during order confirmation? (Choose three.)
A. Work Center
B. Production Scheduling Profile
C. Material Master (Finished Product)
D. Routing
E. Material Master (Component)
Answer: A,D,E
QUESTION NO: 7
Which of the following master data do you need to provide for process manufacturing?
(Choose three.)
A. Resources
B. Master recipe
C. Serial numbers
D. Product cost collector
E. Production versions
Answer: A,B,E
QUESTION NO: 8
In your company planning strategies are used in the SAP-ECC demand management that are based on
consumption. Which of the following statements about consumption is true?
(Choose two.)
A. A consumption situation is dynamic and is always restructured with the planning run.
B. Consumption can also take place between order reservations and planned independent requirements,
depending on the strategy.
C. Consumption always takes place on the material level between the planned independent requirements
and the planned orders.
D. The consumption parameters (consumption mode and consumption interval) can be set in the material
master or in the MRP group.
Answer: B,D
QUESTION NO: 9
In production order processing, for which of the following objects can you enter a confirmation?
(Choose three.)
A. Work Center
B. Individual Capacity
3 / 21
C. Order
D. Operation / Suboperation
E. Trigger Point
Answer: B,C,D
QUESTION NO: 10
Which types of objects can be changed with Engineering Change Management?
(Choose three.)
A. Bill of Materials
B. Work Center
C. Task List
D. Production Version
E. Material Master
Answer: A,C,E
QUESTION NO: 11
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that
one of the assemblies will not be available in time for the scheduled final assembly because of automatic
forward scheduling.
Which planning procedure would you use to process the problem in order to create a solution that is
feasible from a requirements planning perspective?
A. Multi-level single-item planning with the simulation mode option
B. Multi-level single-item planning with the display results before saving option
C. Interactive single-item planning for the delayed assembly
D. Total planning online
Answer: A
QUESTION NO: 12
Which of the following statements about the SAP Solution Manager listed is correct?
A. Solution Manager is part of the SAP ECC System.
B. Solution Manager is an add-on industry solution.
C. Solution Manager is a stand-alone system that communicates with other systems in a system
landscape.
D. Solution Manager is a satellite system in a system landscape.
Answer: C
QUESTION NO: 13
In SAP ECC, you want to map an in-house production process for general warehouse production. The
fields in the area of the lot size-dependent in-house production time are to be populated when the material
master for the final product is created. These fields can be maintained by updating from the scheduling
result for the associated routing. You now think that there could be significant changes to the production
times in the routing and decide against updating the material master. What problem could this lead to?
A. Subsequent capacity planning is no longer possible due to the obsolete scheduling parameters.
B. Requirements planning runs up against an exception message in basic dates scheduling because the
4 / 21
material master parameters do not match the scheduling result from the routing.
C. In the course of basic dates scheduling with requirements planning, dependent requirements request
the components from the bill of materials at the wrong times.
D. Lead time scheduling, which occurs by the time that a planned order is converted into a production
order (at the latest), cannot take place on the basis of incorrect basic dates.
Answer: C
QUESTION NO: 14
Which of the following requirements for a manufacturing plant can be supported by using process
manufacturing? (Choose three.)
A. Master recipe-based manufacturing.
B. Material requirements planning for production resources.
C. Manufacturing without orders.
D. Variable calculation of material quantities (product output, material usage).
E. Manufacturing in charge quantities.
Answer: A,D,E
QUESTION NO: 15
Which objects can you use in the production order for a material component to propose the storage
location in its reservation? (Choose three.)
A. Routing
B. Work center
C. Material master (component)
D. Material master (product)
E. Production version
Answer: B,C,E
QUESTION NO: 16
From what point can you no longer use the Read PP master data in the production order?
A. After printing the order papers.
B. After the first posting of goods movements or confirmation.
C. From the release of the production order.
D. After assigning the confirmed quantity of a material component due to carrying out a material
availability check.
Answer: B
QUESTION NO: 17
Which options can you offer someone who uses the SAP ECC system for production orders and requires
support for material supply in production? (Choose three.)
A. Automatic generation of a transport order
B. Material directory
C. Pull list
D. Pick list
E. Logistics Information System (LIS)
5 / 21
Answer: A,C,D
QUESTION NO: 18
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula
parameters for calculation. What can be the origin of the formula parameters used for scheduling?
(Choose three.)
A. General values from work scheduling view in the material master
B. Standard value from operation in task list
C. User-defined field from operation in task list
D. General operation values in task list
E. General item values in bill of materials
Answer: B,C,D
QUESTION NO: 19
A user has entered planning strategy group 10 (make-to-stock production) in the material master (SAP
ECC) of a product. For the coming months, requirements with requirement type LSF (derived from the
main strategy 10) have been planned. The user would like to change the requirement type from LSF to
VSF planning with final assembly (in accordance with planning strategy 40) for requirements in the
production plan that have already been saved.
Which of the following statements are applicable in this case? (Choose two.)
A. The user has to change the requirement type for planning strategy 10 to VSF planning with final
assembly in Customizing. The requirement type for all existing requirements is then changed
automatically.
B. The present requirement for the product can be changed manually from LSF to VSF in the
Requirement Type field in the production plan, so that the new strategy 40 determines the next planning
operation.
C. The user can enter the new planning strategy group 40 in the material master of the product, but the
requirement type is not changed automatically for existing requirements.
D. The planning strategy group can be changed from 10 to 40 in the existing production plan, and the
requirement type for all requirements is changed automatically.
Answer: B,C
QUESTION NO: 20
Which of the following statements about the planning functions available in SAP ECC are true?
(Choose two.)
A. Master production scheduling (MPS) refers to preferred planning of important materials.
B. Material requirements planning (MRP) does not include automatic capacity leveling.
C. Long-term planning (LTP) is a long-term form of forecast planning.
D. In demand management (DM) material shortage situations are identified and given requirement
coverage elements.
Answer: A,B
QUESTION NO: 21
Which data forms the basis for calculating the capacity requirement for an operation?
剩余20页未读,继续阅读
帕特里克-宋
- 粉丝: 2
- 资源: 16
上传资源 快速赚钱
- 我的内容管理 收起
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
会员权益专享
最新资源
- 2023年中国辣条食品行业创新及消费需求洞察报告.pptx
- 2023年半导体行业20强品牌.pptx
- 2023年全球电力行业评论.pptx
- 2023年全球网络安全现状-劳动力资源和网络运营的全球发展新态势.pptx
- 毕业设计-基于单片机的液体密度检测系统设计.doc
- 家用清扫机器人设计.doc
- 基于VB+数据库SQL的教师信息管理系统设计与实现 计算机专业设计范文模板参考资料.pdf
- 官塘驿林场林防火(资源监管)“空天地人”四位一体监测系统方案.doc
- 基于专利语义表征的技术预见方法及其应用.docx
- 浅谈电子商务的现状及发展趋势学习总结.doc
- 基于单片机的智能仓库温湿度控制系统 (2).pdf
- 基于SSM框架知识产权管理系统 (2).pdf
- 9年终工作总结新年计划PPT模板.pptx
- Hytera海能达CH04L01 说明书.pdf
- 数据中心运维操作标准及流程.pdf
- 报告模板 -成本分析与报告培训之三.pptx
资源上传下载、课程学习等过程中有任何疑问或建议,欢迎提出宝贵意见哦~我们会及时处理!
点击此处反馈
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功
评论0