SAP Implementation Project
Module : PP
Doc:raw.doc
Update: 6/30/2008 04:30:00 PM
PP - Conguration Log
Author: Caroline Kao Page : 1 / 22
Transaction/Menu path Rationale Configuration description Owner Date Ref.
1.
<OX10>
IMG>Enterprise
structure>Definition>
Logistics
General>Define,copy,dele
te,check plant
Set up the plant code for
G_luxon
LTW0 LPRC Plant
LSZ1 G_luxon Suzhou Plant
Country = CN, Language = EN ,
Factory cal. = SZ
Michael 2001/08/01
Plant Level
定义工厂
2. <OX18>
IMG> Enterprise structure>
Assignment>Logistics
General>Assign Plant to
company code
Assign plant to Company
code
LSZ1 LSZ Michael 2001/08/01
Plant Level
分配工厂
3.
<OMDU>
IMG>Production > Material
Requirements Planning >
Planning File Entries >
Activate MRP and set up
Planning files
Material Requirements
Planning
(Activate MRP plant)
LSZ1 Active Requirements Planning Joyce 2001/08/14
Plant Level
R3DK906910
激活物料需求
计划
4.
<OPJH>
IMG>Production >Shop flow
control > Master data > Order
> Define Orders types
Create order types in order to
use different number range in
the plant
Plant : LSZ1
SZ00 SZ Paste production order
SZ01 SZ DIP EC Production order
SZ02 SZ V-chip production order
SZ03 SZ Extras ECA production order
SZ04 SZ Cutting production order
SZ05 SZ Rework Production order
SZ06 SZ Snap_in production order
Joyce 2001/08/14
R3DK906912
维护生产订单
类型
5.
<OPL8>
Assign order types to plant.
Assign Production order type SZ00 , SZ01 ,
Joyce
2001/08/14 R3DK906914
Status: OKComplete IPIn progress HDHold
Plan changed subject to mutual approval to meet real situation needs
SAP Implementation Project
Module : PP
Doc:raw.doc
Update: 6/30/2008 04:30:00 PM
PP - Conguration Log
Author: Caroline Kao Page : 2 / 22
Transaction/Menu path Rationale Configuration description Owner Date Ref.
IMG>Production > Shop flow
control > Master data > Order
> Define Order type-
dependent parameters
SZ02,SZ03,SZ04,SZ05,SZ06 to plant LSZ1.
Results Analysis Key 000001 (Results
Analysis)
订单类型相关
参数维护
6.
< CO82>
IMG>Production > Shop flow
control > Master data > Order
> Define number ranges for
orders
Define number ranges for
orders
SZ00 3000000000 – 3099999999
SZ01 3100000000 – 3199999999
SZ02 3200000000 – 3299999999
SZ03 3300000000 – 3399999999
SZ04 3400000000 – 3499999999
SZ05 3500000000 – 3599999999
SZ06 3600000000 – 3699999999
Joyce 2001/08/14
订单编号范围
7.
<OPJK>
IMG>Production > Shop
floor control > Operations >
Availability check > Define
Check control
Define availability check
control for the order types of
each plant
14 entries are created plant LSZ1
SZ00 1 ; SZ00 2
SZ01 1 ; SZ01 2
SZ02 1 ; SZ02 2
SZ03 1 ; SZ03 2
SZ04 1 ; SZ04 2
SZ05 1 ; SZ05 2
SZ06 1 ; SZ05 2
Check Mat’l avail. PRT, Cap. No Check
BO: Back order processing
Joyce 2001/08/14
R3DK906916
工序订单控制
Status: OKComplete IPIn progress HDHold
Plan changed subject to mutual approval to meet real situation needs
SAP Implementation Project
Module : PP
Doc:raw.doc
Update: 6/30/2008 04:30:00 PM
PP - Conguration Log
Author: Caroline Kao Page : 3 / 22
Transaction/Menu path Rationale Configuration description Owner Date Ref.
8.
<OPU3>
IMG>Production>Shop floor
control>Operations>Scheduli
ng>Define Scheduling
Parameters for Production
Orders
Define Scheduling
Parameters for Production
Orders
Plant: LSZ1 Order type:
SZ00,SZ01,SZ02,SZ03,SZ04,SZ05,SZ06
ProdSchduler:*
Genarate Capacity reqs.
Scheduling type : Only capacity requirement
Joyce 2001/08/14
R3DK906918
调度为生产订
单定义计划参
数
9.
<OPK4>
IMG>Production > Shop
Floor Control > Operations >
Confirmation > Define
confirmation parameters
Define confirmation
parameters for each order
type in plant LSZ1
Define confirmation parameters for:
Four entries are created for the plant LSZ1
Confirmation parameters are set for order type
SZ00 , SZ01 , SZ02,SZ03,SZ04,SZ05,SZ06
Joyce 2001/08/14
R3DK906920
订单确认参数
10.
< OPPQ >
IMG>Production > Material
requirements planning > Plant
Parameters>Carry Out
Overall Maintenance of Plant
Parameters
Plant Parameters
Item11~29
1. Create
2. MaintainLSZ1
Number RangesOMI2(11)
Check.rule:backordersOPJJ(12)
MRP ControllersOMD0(13)
Special ProcurementOMD9(14)
FloatsOMDC/OPJZ(15)
ConversionOPPE/OMDV(16/17)
Dep.reqmt availabilityOPPJ(18)
ReportingOPPC(19)
PerformanceSAP Default
Joyce
2001/08/15 R3DK906922
工厂参数总体
维护
Status: OKComplete IPIn progress HDHold
Plan changed subject to mutual approval to meet real situation needs
SAP Implementation Project
Module : PP
Doc:raw.doc
Update: 6/30/2008 04:30:00 PM
PP - Conguration Log
Author: Caroline Kao Page : 4 / 22
Transaction/Menu path Rationale Configuration description Owner Date Ref.
BOM/Routing SelectionOPPA(20)
BOM explosion SAP Default
Param:detailed sched.OPU5(21)
External procurementOMDT(22)
ReschedulingOMDW(23)
Planning HorizonOMDX(24)
Available stockOPPI(25)
Direct procurementOPPB(26)
Error handlingOMDY(27)
Item numbersOMI5(28)
Order start in pastOMIT(29)
11.
<OMI2>
IMG>Production > Material
Requirements Planning >
Number Ranges > Define
Number Ranges for Planning
Run
Define Number Ranges for
Planning Run
Planned orders : 01
Dependent reqmts : 01
Purch. Requisitions : 01
No.rge MRP list : 01
Total requirements : 01
Sim.dependent reqmts : 01
Joyce 2001/08/15
R3DK906924
定义计划运行
号码范围
12.
<OPJJ>
IMG>Production > Shop
Flow Control > Operations >
Availability check > Define
Scope of Check
Define Scope of Check .Add checking rule “BO” to availability check
02
Stocks : Include safety stock
Replenishment :
Check without RLT
Michael
2001/08/03 已建立
定义可用性检
查范围
Status: OKComplete IPIn progress HDHold
Plan changed subject to mutual approval to meet real situation needs
SAP Implementation Project
Module : PP
Doc:raw.doc
Update: 6/30/2008 04:30:00 PM
PP - Conguration Log
Author: Caroline Kao Page : 5 / 22
Transaction/Menu path Rationale Configuration description Owner Date Ref.
Receipt / Issue :
Incl.depen.reservat. : X
.Add checking rule “P1” to availability check 02
Stocks : Include safety stock
StockInTransfer
Incl.quality insp. Stock
Replenishment :
Check without RLT
Receipt / Issue :
Incl.Puchase Order
Incl.Puchase Requisitions
Include reservations
Include sales reqmts.
Include delieveries
Incl.depen.reservat. : X
Incl. production orders : F
13.
< OMD0>
IMG>Production > Material
requirements planning >
Master data > Define MRP
controllers
Create MRP controllers
For plant
Create MRP controllers in LSZ1
DIP (EC)
S44φ S55φ S66φ S88φ
S1010φ S1313φ S1616φ S1818φ
S2222φ S2525φ S3030φ
S3535φS4040φ S5151φ S6363φ
Joyce 2001/08/15
R3DK906930
定义 MRP 控
制者
Status: OKComplete IPIn progress HDHold
Plan changed subject to mutual approval to meet real situation needs
剩余21页未读,继续阅读
jjkol
- 粉丝: 0
- 资源: 4
上传资源 快速赚钱
- 我的内容管理 收起
- 我的资源 快来上传第一个资源
- 我的收益 登录查看自己的收益
- 我的积分 登录查看自己的积分
- 我的C币 登录后查看C币余额
- 我的收藏
- 我的下载
- 下载帮助
会员权益专享
最新资源
- 数据结构1800题含完整答案详解.doc
- 医疗企业薪酬系统设计与管理方案.pptx
- 界面与表面技术界面理论与表面技术要点PPT学习教案.pptx
- Java集合排序及java集合类详解(Collection、List、Map、Set)讲解.pdf
- 网页浏览器的开发 (2).pdf
- 路由器原理与设计讲稿6-交换网络.pptx
- 火电厂锅炉过热汽温控制系统设计.doc
- 企业识别CIS系统手册[收集].pdf
- 物业管理基础知识.pptx
- 第4章财务预测.pptx
- 《集成电路工艺设计及器件特性分析》——实验教学计算机仿真系.pptx
- 局域网内共享文件提示没有访问权限的问题借鉴.pdf
- 第5章网络营销策略.pptx
- 固井质量测井原理PPT教案.pptx
- 毕业实习总结6篇.doc
- UGNX建模基础篇草图模块PPT学习教案.pptx
资源上传下载、课程学习等过程中有任何疑问或建议,欢迎提出宝贵意见哦~我们会及时处理!
点击此处反馈
安全验证
文档复制为VIP权益,开通VIP直接复制
信息提交成功
评论3