HAUW SUWITO, CONSULTANT
Design Review Checklist
V1.0
Table of Content
Introduction ...................................................................................................................................... 1
Checklist for Design Kick-off review ................................................................................................ 2
Checklist for RTL code release design review ................................................................................ 3
Checklist for Mask Release Design Review.................................................................................... 4
Introduction
This checklist consists of three parts, each for a specific design milestone: (1) Design Kick-off (2)
RTL Release and (3) Tapeout. Design Kick-off starts the design activity. The team reviews and
agrees upon the project plan, design specification and other project documents before starting
the design work. The RTL Release milestone may consist of several releases, depending on the
scope of the project. A RTL of major block or the entire chip is released after simulations,
synthesis and timing closure have been completed. Tapeout milestone starts the mask production
after all physical, timing and functional are reviewed and signed off.
1000 Bristol North Suite#17-222, Newport Beach, CA.92660♦Tel: 949.413.9135 ♦ Fax: 949.477.4015
www.suwito.net