没有合适的资源?快使用搜索试试~ 我知道了~
首页ECE R10 5.pdf
资源详情
资源推荐
![](https://csdnimg.cn/release/download_crawler_static/11834796/bg1.jpg)
GE.14-
Agreement
Concerning the Adoption of Uniform Technical Prescriptions for
Wheeled Vehicles, Equipment and Parts which can be Fitted and/or be
Used on Wheeled Vehicles and the Conditions for Reciprocal
Recognition of Approvals Granted on the Basis of these Prescriptions*
(Revision 2, including the amendments which entered into force on 16 October 1995)
_________
Addendum 9: Regulation No. 10
Revision 5
Incorporating all valid text up to:
Corrigendum 1 to Revision 4 of the Regulation (Erratum by the secretariat)
Supplement 1 to the 04 series of amendments - Date of entry into force: 26 July 2012
Supplement 2 to the 04 series of amendments - Date of entry into force: 15 July 2013
05 series of amendments – Date of entry into force: 9 October 2014
Uniform provisions concerning the approval of vehicles with regard to
electromagnetic compatibility
_________
UNITED NATIONS
* Former title of the Agreement: Agreement Concerning the Adoption of Uniform Conditions of
Approval and Reciprocal Recognition of Approval for Motor Vehicle Equipment and Parts, done at
Geneva on 20 March 1958.
E/ECE/324/Add.9/Rev.5−E/ECE/TRANS/505/Add.9/Rev.5
16 October 2014
![](https://csdnimg.cn/release/download_crawler_static/11834796/bg2.jpg)
![](https://csdnimg.cn/release/download_crawler_static/11834796/bg3.jpg)
E/ECE/324/Add.9/Rev.5
E/ECE/TRANS/505/Add.9/Rev.5
3
Regulation No. 10
Uniform provisions concerning the approval of vehicles with
regard to electromagnetic compatibility
Contents
Page
Regulation
1. Scope ........................................................................................................................................ 6
2. Definitions ................................................................................................................................ 6
3. Application for approval .......................................................................................................... 8
4. Approval ................................................................................................................................... 11
5. Markings .................................................................................................................................. 12
6. Specification in configurations other than REESS charging mode coupled
to the power grid ...................................................................................................................... 13
7. Additional specifications in the configuration "REESS charging mode coupled
to the power grid" ..................................................................................................................... 18
8. Amendment or extension of a vehicle type approval following electrical/electronic
sub-assembly (ESA) addition or substitution .......................................................................... 30
9. Conformity of production......................................................................................................... 31
10. Penalties for non-conformity of production ............................................................................. 32
11. Production definitively discontinued ........................................................................................ 32
12. Modification and extension of type approval of a vehicle or ESA ......................................... 32
13. Transitional provisions ............................................................................................................. 32
14. Names and addresses of Technical Services conducting approval tests and
of Type Approval Authorities .................................................................................................. 34
Appendix 1 - List of standards referred to in this Regulation .................................................. 35
Appendix 2 - Vehicle broadband reference limits - Antenna-vehicle separation: 10 m .......... 37
Appendix 3 - Vehicle broadband reference limits - Antenna-vehicle separation: 3 m ............. 38
Appendix 4 - Vehicle narrowband reference limits - Antenna-vehicle separation: 10 m ........ 39
Appendix 5 - Vehicle narrowband reference limits - Antenna-vehicle separation: 3 m .......... 40
Appendix 6 - Electrical/electronic sub-assembly - Broadband reference limits ....................... 41
Appendix 7 - Electrical/electronic sub-assembly - Narrowband reference limits .................... 42
Appendix 8 - HV artificial network ......................................................................................... 43
![](https://csdnimg.cn/release/download_crawler_static/11834796/bg4.jpg)
E/ECE/324/Add.9/Rev.5
E/ECE/TRANS/505/Add.9/Rev.5
4
Annexes
1 Examples of approval marks .................................................................................................... 45
2A Information document for type approval of a vehicle with respect to
electromagnetic compatibility .................................................................................................. 46
2B Information document for type approval of an electric/electronic sub-assembly
with respect to electromagnetic compatibility .......................................................................... 50
3A Communication concerning the approval or extension or refusal or withdrawal of approval or
production definitively discontinued of a type of vehicle/component/separate technical unit
with regard to Regulation No. 10 ............................................................................................ 52
3B Communication concerning the approval or extension or refusal or withdrawal of approval or
production definitively discontinued of a type of electrical/electronic sub-assembly with regard
to Regulation No. 10 ................................................................................................................ 54
4 Method of measurement of radiated broadband electromagnetic emissions from vehicles ..... 56
Appendix 1 .............................................................................................................................. 60
5 Method of measurement of radiated narrowband electromagnetic emissions from vehicles ... 66
6 Method of testing for immunity of vehicles to electromagnetic radiation ............................... 68
Appendix .................................................................................................................................. 74
7 Method of measurement of radiated broadband electromagnetic emissions from
electrical/electronic sub-assemblies (ESAs) ............................................................................. 81
Appendix .................................................................................................................................. 84
8 Method of measurement of radiated narrowband electromagnetic emissions from
electrical/electronic sub-assemblies ......................................................................................... 86
9 Method(s) of testing for immunity of electrical/electronic sub-assemblies to
electromagnetic radiation ......................................................................................................... 88
Appendix 1 ............................................................................................................................... 93
Appendix 2 - Typical TEM cell dimensions ............................................................................ 95
Appendix 3 - Absorber chamber test ........................................................................................ 96
Appendix 4 - BCI test .............................................................................................................. 97
10 Method(s) of testing for immunity to and emission of transients of electrical/electronic
sub-assemblies .......................................................................................................................... 98
11 Method(s) of testing for emission of harmonics generated on AC power lines from vehicle .. 99
Appendix 1 ............................................................................................................................... 101
12 Method(s) of testing for emission of voltage changes, voltage fluctuations and flicker
on AC power lines from vehicle ............................................................................................... 102
Appendix 1 ............................................................................................................................... 104
13 Method(s) of testing for emission of radiofrequency conducted disturbances on AC or
DC power lines from vehicles .................................................................................................. 105
Appendix 1 ............................................................................................................................... 107
![](https://csdnimg.cn/release/download_crawler_static/11834796/bg5.jpg)
E/ECE/324/Add.9/Rev.5
E/ECE/TRANS/505/Add.9/Rev.5
5
14 Method(s) of testing for emission of radiofrequency conducted disturbances on
network and telecommunication access from vehicles ............................................................. 109
Appendix 1 ............................................................................................................................... 111
15 Method of testing for immunity of vehicles to Electrical Fast Transient/Burst
disturbances conducted along AC and DC power lines ............................................................ 115
Appendix 1 ............................................................................................................................... 117
16 Method of testing for immunity of vehicles to surges conducted along AC and DC
power lines ............................................................................................................................... 118
Appendix 1 - Vehicle in configuration "REESS charging mode coupled to the power grid" .. 120
17 Method(s) of testing for emission of harmonics generated on AC power lines from
an ESA ..................................................................................................................................... 122
Appendix 1 ............................................................................................................................... 124
18 Method(s) of testing for emission of voltage changes, voltage fluctuations and flicker
on AC power lines from an ESA .............................................................................................. 125
Appendix 1 ............................................................................................................................... 127
19 Method(s) of testing for emission of radiofrequency conducted disturbances on AC
or DC power lines from an ESA .............................................................................................. 128
Appendix 1 ............................................................................................................................... 130
20 Method(s) of testing for emission of radiofrequency conducted disturbances on
network and telecommunication access from an ESA ............................................................. 131
21 Method of testing for immunity of an ESA to Electrical Fast Transient/Burst
disturbances conducted along AC and DC power lines ........................................................... 134
Appendix 1 ............................................................................................................................... 136
22 Method of testing for immunity of ESAs to surges conducted along AC and DC
power lines ............................................................................................................................... 137
Appendix 1 - ESA in configuration "REESS charging mode coupled to the power grid" ....... 139
剩余139页未读,继续阅读
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://csdnimg.cn/download_wenku/file_type_ask_c1.png)
![](https://profile-avatar.csdnimg.cn/default.jpg!1)
a0713070101
- 粉丝: 5
- 资源: 9
上传资源 快速赚钱
我的内容管理 收起
我的资源 快来上传第一个资源
我的收益
登录查看自己的收益我的积分 登录查看自己的积分
我的C币 登录后查看C币余额
我的收藏
我的下载
下载帮助
![](https://csdnimg.cn/release/wenkucmsfe/public/img/voice.245cc511.png)
会员权益专享
最新资源
- 京瓷TASKalfa系列维修手册:安全与操作指南
- 小波变换在视频压缩中的应用
- Microsoft OfficeXP详解:WordXP、ExcelXP和PowerPointXP
- 雀巢在线媒介投放策划:门户网站与广告效果分析
- 用友NC-V56供应链功能升级详解(84页)
- 计算机病毒与防御策略探索
- 企业网NAT技术实践:2022年部署互联网出口策略
- 软件测试面试必备:概念、原则与常见问题解析
- 2022年Windows IIS服务器内外网配置详解与Serv-U FTP服务器安装
- 中国联通:企业级ICT转型与创新实践
- C#图形图像编程深入解析:GDI+与多媒体应用
- Xilinx AXI Interconnect v2.1用户指南
- DIY编程电缆全攻略:接口类型与自制指南
- 电脑维护与硬盘数据恢复指南
- 计算机网络技术专业剖析:人才培养与改革
- 量化多因子指数增强策略:微观视角的实证分析
资源上传下载、课程学习等过程中有任何疑问或建议,欢迎提出宝贵意见哦~我们会及时处理!
点击此处反馈
![](https://img-home.csdnimg.cn/images/20220527035711.png)
![](https://img-home.csdnimg.cn/images/20220527035711.png)
![](https://img-home.csdnimg.cn/images/20220527035111.png)
安全验证
文档复制为VIP权益,开通VIP直接复制
![](https://csdnimg.cn/release/wenkucmsfe/public/img/green-success.6a4acb44.png)