http://www.paper.edu.cn
成本倒推装卸工问题
任云霞 王世英
河南师范大学数学和信息科学学院,河南 新乡 453002
摘要: 本文根据装卸工问题的实际应用, 提出了成本倒推装卸工问题。证明一类成本倒推装
卸工问题是 NP 完全的和讨论了一类特殊的成本倒推装卸工模型的解的情况。
关键词: 装卸工问题; 成本倒推; NP 完全
中图分类号: O22
The cost-over turning model of the loader
problem
REN Yun-xia , WANG Shi-ying
College of Mathematics and Information Science, Henan Normal University, Xinxiang, Henan
453002, China
Abstract: The cost-over turning way of enterprise management is one important way.
Recently, the loader problem has been studied extensively. In this paper, the cost-over
turning model of the loader problem is posed. We prove that a lass of the cost-over turning
model of the loader problem is NP-complete and we discuss its solutions in a special case.
Key words: cost-over turning models; the loader problem; NP-complete
0 引言
据有关专家统计分析,商品成本中约有 64% 以上为成本
[1]
。近年来,受燃油价格及劳动
力成本上涨等因素影响,物流成本呈现较快增长态势。2011 年全国重点企业物流统计调查报
告显示,工业、批发和零售业企业物流成本比上年增长 18.2%,增幅同比提高 10 个百分点。
其中,运输成本增长 13.7%,增幅提高 11.9 个百分点;保管成本增长 22.4%,增幅提高 10.5
个百分点;管理成本增长 17.2%,增幅提高 6.5 个百分点 [2]。因此,有效的降低成本,成为企
业制胜的法宝。根据这一现状,本章提出了成本倒推模型来解决物流中的装卸工问题。
有一客户预算出资 C 元将一个物流项目外包给运输 (物流) 公司。运输公司有 m 辆货车
A
1
, A
2
, · · · , A
m
要向 n 个站点 B
1
, B
2
, · · · , B
n
装卸货物。在装卸过程中,运输公司要在每辆
货车上安排跟车的装卸工,也可以在每个站点上雇佣当地的装卸工。货车 A
i
上跟车的装卸工
必须装卸向所有 n 个站点装卸的货物,最多可以跟车的装卸工数是 c
i
,支付给每位跟车装卸
工的费用是 p
i
;在站点 B
j
处雇佣的装卸工必须装卸所有 m 辆货车到这个站点上装卸的货物,
基金项目: 国家自然科学基金资助项目 (61070229),教育部博士点基金(博导类)资助项目 (20111401110005)
作者简介: 任云霞 (1979-), 女, 河南驻马店人, 河南师范大学数学和信息科学学院教师,研究方向:运筹学. 通信联系人: 王世
英 (1961-), 男,博士,教授,博导. E-mail:wangshiying@htu.cn.
- 1 -