吉林建筑工程学院学报
Journal
of
Jil
in
Institute
of
Architecture
&
Civil
Engineering
倒退法在斜拉桥合龙分析中的闭合探讨
孙连财
l
赵群
2
Vo
l.
29
No
.4
Aug.2012
( 1
:吉林市公路管理处,吉林
132106;
2:
吉林市公路规划勘测设计院有限公司,吉林
13201
1)
摘要:斜拉桥合龙段施工过程非常复杂,由倒退法确定理想施工状态,一般会遇到不问合的问题.本文分析了引起
合龙施工阶段时倒退分析不闭合的因素,并探讨了解决措施;最后将其应用于兰旗松花江特大桥边跨合龙分析中,
成功的指导了施工.
关键词:倒退法;斜拉桥;合龙;闭合
中图分类号
:TU
312.3
文献标志码
:A
文章编号:
1009 - 0185 (2012) 04 - 0033 - 04
Probing into the conformity
in
the
closure
of
cable - stayed bridge complied with hyperbaton
SUN Lian - cai
1
, ZHAO Qun
2
(1: Jilin City Highway Management Office, Jilin, China 132106;
2:
Jilin City
High
ω
ay
Planning Survey Design
Co.
, LTD, Jilin, China 132011)
Abstract:
In
the
joining
也
e
two
sections of a cable - stayed
bridge
,出
e
construction is a
verγcomplicated
process.
There always come forth unconformities when seeking for an idea construction state complied
wi
出
hyperbaton.
This
paper
analyzed some
factor
百
which
causing the unconformity in the hyperbaton compute during the joining the
two
sections, and probed into some measures
to
deal
with
由
is
problem. In the end of the paper, the measures are suc-
cessfully used in the joining the
two
sections of side spans of Lanqi Songhuajiang bridge.
Keywords:
hyperbaton; cable - stayed bridge; closure; conformity
主梁合龙段的施工,对于一座桥梁的建设具有举足轻重的意义,是整座桥梁的关键所在,也是桥梁主体
施工的关键和复杂工序之一.通常斜拉桥在进入合龙段时,己具有很长的悬臂,此时很小的荷载及温度变化
将对悬臂端的标高和伸缩变形产生很大的影响.一方面,合龙段长度一般为
2m
,线型调整的余地很小;另一
方面此时悬臂端标高对外界因素非常敏感.因此,对于合龙段的施工控制尤为重要,关系到全桥线形是否平
顺,结构内力是否理想.
目前,桥梁施工控制的结构计算方法主要包括:正装分析法、倒退分析法和元应力状态计算法.一般而
言,以正装计算结果作为应力监测的依据,以倒退计算结果作为预拱度设置的依据.正装计算法可以严格按
照设计好的施工步骤进行各阶段内力分析,但由于分析中结构节点坐标的迁移,将造成各施工阶段线形控制
难度大,容易出现合龙困难,成桥状态不符合设计要求.如果按照倒退分析法计算出的桥梁结构各阶段中间
状态去指导施工,将会避免节点坐标的迁移,减少施工控制的工作量.这样,需要按照桥梁结构实际施工受力
状态顺序的逆过程(倒退法)来进行结构行为计算施工预拱度和指导合龙段的施工
[1)
主梁合龙段施工的模拟是斜拉桥施工过程计算中的一个重要环节,在分析计算过程中必须考虑具体情
况,正确模拟此施工过程中整个结构力学上准确的变化情况,避免和减少合龙后为了使结构内力理想而反复
调整索力的麻烦,从而使计算结果与结构中的实际受力状态相符.
收稿日期
:2012
-04
-25.
作者简介:孙连财(1
970
寸,男,吉林省吉林市人,高级工程师.