"英国风力发电标准:G83-1-1逆变器并网标准与控制器要求"

0 下载量 25 浏览量 更新于2024-03-15 收藏 354KB PDF 举报
The document "G83/1-1 - Recommendations for the Connection of Small-scale Embedded Generators (Up to 16A per Phase) in Parallel with Public Low-Voltage Distribution Networks" was produced by the Engineering Directorate of the Energy Networks Association in June 2008. This document outlines the standards for connecting small-scale embedded generators, specifically wind turbine inverters and controllers, to public low-voltage distribution networks in the UK. The purpose of this document is to ensure the safe and efficient integration of small-scale renewable energy systems, such as wind turbines, into the existing electricity grid. By following the guidelines outlined in G83/1-1, operators of these systems can ensure that their installations are compliant with industry standards and regulations. Key recommendations included in the document cover various aspects of the connection process, including equipment specifications, installation requirements, and safety considerations. For example, the document specifies that inverters and controllers must meet certain technical requirements in order to be eligible for connection to the distribution network. Additionally, it outlines procedures for monitoring and controlling the output of the generator to ensure grid stability and reliability. Overall, the document serves as a comprehensive guide for stakeholders involved in the deployment of small-scale wind energy systems in the UK. By following the recommendations set forth in G83/1-1, operators can ensure the successful integration of their generators while promoting the growth of renewable energy sources and reducing carbon emissions in the electricity sector.