Otherwise, when the data is offloaded for edge execution (xti = 1), we denote Pit as the transmit power constrained by the maximum power Pt ≤ Pmax and τtT as the amount of time iii allocated to the ith WD for computation offloading. Here, τit ∈ [0, 1] and Ni=1 τit ≤ 1. The energy consumed on data offloading is Eit,O = PitτitT. Similar to [4] and [8], we neglect the delay on edge computing and result downloading such that the amount of data processed at the edge within the time frame is Dt =WτitTlog 1+Pithti=WτitTlog 1+Eit,Ohti, ∀xt =1, ,Eoit,pit为什么显示数据离载
时间: 2024-01-23 20:02:28 浏览: 15
这段话是关于在边缘计算中数据离载(offloading)的能耗和数据处理量的描述。其中Eit,O表示数据离载的能耗,Pit表示传输功率受到最大功率Pmax的限制,τit表示分配给第i个无线设备(WD)的离载计算时间,Dt表示在这段时间内边缘计算处理的数据量。这里忽略了边缘计算和结果下载的延迟。所以数据离载是因为在某些情况下,无线设备的计算资源有限,需要将一部分计算任务离载到云端或边缘服务器等其他设备上进行处理。
相关问题
Otherwise, when the data is offloaded for edge execution (xti = 1), we denote Pit as the transmit power constrained by the maximum power Pt ≤ Pmax and τtT as the amount of time iii allocated to the ith WD for computation offloading. Here, τit ∈ [0, 1] and Ni=1 τit ≤ 1. The energy consumed on data offloading is Eit,O = PitτitT. Similar to [4] and [8], we neglect the delay on edge computing and result downloading such that the amount of data processed at the edge within the time frame is Dt =WτitTlog 1+Pithti=WτitTlog 1+Eit,Ohti, ∀xt =1, ,Eoit,pit是什么
根据文中的描述,Eit,O表示第i个设备的数据离载能耗,Pit表示传输功率的限制,由最大功率Pt ≤ Pmax决定,τit表示分配给第i个设备的计算离载时间,且τit ∈ [0, 1],并且所有设备的计算离载时间之和不超过1(即Ni=1 τit ≤ 1)。因此,Eit,O = PitτitT表示第i个设备的数据离载能耗。
As illustrated in Fig. 1, we consider the general layout of HetNets, where each macro-BS serves multiple UE devices and contains a few backhaul-constrained small BSs within its range. Since the small BSs are backhaul-constrained, when UEs are offloaded to a small BS, the small BS may be overloaded when the number of serving UE devices exceeds its capacity (e.g., the small BS identified by the dotted line in Fig. 1). In this scenario, the overloaded small BS cannot provide the serving UEs with the expected QoS. Therefore, the backhaul capacity must be considered as a limitation in the design of the user association algorithm.翻译
如1所示,我们考虑HetNets的一般布局,其中每个宏基站为多个UE设备提供服务,并在其范围内包含一些受后向链路限制的小型基站。由于小型基站受到后向链路的限制,当UE设备被离载到小型基站时,当服务的UE设备数量超过其容量时(例如,图1中由虚线标识的小型基站),小型基站可能会超载。在这种情况下,超载的小型基站无法为服务的UE设备提供预期的QoS。因此,在设计用户关联算法时必须考虑后向链路容量作为限制因素。