没有合适的资源?快使用搜索试试~ 我知道了~
首页93K Use Manual
资源详情
资源评论
资源推荐

Verigy V93000
SOC Series
User Training Part 1
Student Guide

Notices
© Verigy Germany GmbH. 2006
No part of this manual may be
reproduced in any form or by any
means (including electronic storage
and retrieval or translation into a
foreign language) without prior
agreement and written consent from
Verigy, Inc. as governed by United
States and international copyright
laws.
Manual Part Number
Edition
Edition 5.4 Tuesday, June 06, 2006
Printed in Germany
Verigy Inc. Deutschland GmbH
Herrenberger Str. 130
71034 Böblingen
Federal Republic of Germany
Warranty
The material contained in this
document is provided “as is,” and
is subject to being changed,
without notice, in future editions.
Further, to the maximum extent
permitted by applicable law,
Verigy disclaims all warranties,
either express or implied, with
regard to this manual and any
information contained herein,
including but not limited to the
implied warranties of
merchantability and fitness for a
particular purpose. Verigy shall
not be liable for errors or for
incidental or consequential
damages in connection with the
furnishing, use, or performance of
this document or of any
information contained herein.
Should Verigy and the user have a
separate written agreement with
warranty terms covering the
material in this document that
conflict with these terms, the
warranty terms in the separate
agreement shall control.
Technology Licenses
The hardware and/or software
described in this document are
furnished under a license and may
be used or copied only in
accordance with the terms of such
license.
Restricted Rights
Legend
If software is for use in the
performance of a U.S. Government
prime contract or subcontract,
Software is delivered and licensed
as “Commercial computer software”
as defined in DFAR 252.227-7014
(June 1995), or as a “commercial
item” as defined in FAR 2.101(a) or
as “Restricted computer software” as
defined in FAR 52.227-19 (June
1987) or any equivalent agency
regulation or contract clause. Use,
duplication or disclosure of Software
is subject to Verigy's standard
commercial license terms, and non-
DOD Departments and Agencies of
the U.S. Government will receive no
greater than Restricted Rights as
defined in FAR 52.227-19(c)(1-2)
(June 1987). U.S. Government users
will receive no greater than Limited
Rights as defined in FAR 52.227-14
(June 1987) or DFAR 252.227-7015
(b)(2) (November 1995), as
applicable in any technical data.
Safety Notices
A CAUTION notice denotes a
hazard. It calls attention to an
operating procedure, practice, or the
like that, if not correctly performed or
adhered to, could result in damage
to the product or loss of important
data. Do not proceed beyond a
CAUTION notice until the indicated
conditions are fully understood and
met.
A WARNING notice denotes a
hazard. It calls attention to an
operating procedure, practice, or
the like that, if not correctly
performed or adhered to, could
result in personal injury or death.
Do not proceed beyond a
WARNING notice until the
indicated conditions are fully
understood and met.

User Training Part 1 3
Contents
User Training Part 1 1
Contents................................................................................................................................ 3
Training Overview 17
Study Materials ..................................................................................................................... 18
Audience ............................................................................................................................... 19
Curriculum............................................................................................................................. 20
Basic Training Classes .................................................................................................... 20
Advanced or Product Specific Training Classes:............................................................. 20
Other Classes Available .................................................................................................. 20
Requirements for Part 1 Training .......................................................................................... 22
Training Objectives................................................................................................................ 23
Creating a Test Program ................................................................................................. 23
Create Tests.................................................................................................................... 23
Execute the test programs............................................................................................... 24
Evaluate the results ......................................................................................................... 25
Application of Test Programs ................................................................................................ 26
Agenda.................................................................................................................................. 27
Monday............................................................................................................................ 27
Tuesday........................................................................................................................... 28
Wednesday...................................................................................................................... 28
Thursday.......................................................................................................................... 29
Friday............................................................................................................................... 29
Documentation Map .............................................................................................................. 30
On the Tester................................................................................................................... 30
Additional Support Resources............................................................................................... 31
STS Internal Web Page................................................................................................... 31
External Web Page.......................................................................................................... 31
e-mail Support ................................................................................................................. 32

4 User Training Part 1
Test Engineer’s Responsibilities 33
In this Lesson... ..................................................................................................................... 34
Test Engineer’s Responsibilities ........................................................................................... 35
Overview.......................................................................................................................... 36
Test Development Flowchart........................................................................................... 38
Creating a Test Plan.............................................................................................................. 39
Device Information........................................................................................................... 40
Shift/Storage Register 74ACT299 ................................................................................... 41
Required Tests for the 74ACT299................................................................................... 44
Designing the DUT Board ..................................................................................................... 46
Basic Process.................................................................................................................. 47
General Rules for DUT Board Design ............................................................................. 53
Multi-site Design Considerations ..................................................................................... 60
Hardware Overview 63
In this Lesson... ..................................................................................................................... 64
Major Components of the Tester........................................................................................... 65
Digital and Analog Components ...................................................................................... 66
Test Head........................................................................................................................ 67
Support Rack................................................................................................................... 68
Manipulator...................................................................................................................... 69
Cooling Unit..................................................................................................................... 71
Power Supply Switch and Indicator Unit.......................................................................... 73
LINUX Workstation .......................................................................................................... 75
Synchronization of Resources............................................................................................... 76
Card Cage............................................................................................................................. 77
Card Cage Layout ........................................................................................................... 78
Board placement ............................................................................................................. 80
DUT Interfaces ...................................................................................................................... 83
DUT Board Layout........................................................................................................... 84
Pogo Block Allocation...................................................................................................... 85
Pogo Block Numbering.................................................................................................... 89
Differential Channels ....................................................................................................... 91
Tester Channel Mapping ................................................................................................. 94
Cardcage Components ......................................................................................................... 95
Channel Boards............................................................................................................... 97
Clock Board..................................................................................................................... 114

User Training Part 1 5
DPS Power Supply .......................................................................................................... 121
DC/DC (Converter) Boards.............................................................................................. 133
Utility Lines............................................................................................................................ 134
Software Overview 137
SmarTest Test Development................................................................................................. 139
Typical Test Scenarios .................................................................................................... 139
Main Components of SmarTest....................................................................................... 140
Equation-Based Setup..................................................................................................... 142
Online Documentation........................................................................................................... 144
Full Text Search Instructions ........................................................................................... 144
Running the Software............................................................................................................ 146
Selected Files and Directories Structure ......................................................................... 147
Start SmarTest ................................................................................................................ 149
Start-Up Screen .................................................................................................................... 151
How to Shut Down SmarTest .......................................................................................... 152
How to use kill_smarTest ................................................................................................ 152
SmarTest Software Structure ................................................................................................ 153
Verigy SmarTest Main Toolbar 154
The Data Manager ................................................................................................................ 165
Data Manager Menus ...................................................................................................... 165
Setup Page...................................................................................................................... 166
Result Page..................................................................................................................... 168
Program Page ................................................................................................................. 170
Setup File Access............................................................................................................ 171
Set Concept .......................................................................................................................... 173
Testflow Editor ...................................................................................................................... 174
Inside the Software................................................................................................................ 178
Firmware Commands ...................................................................................................... 179
Error Messages ............................................................................................................... 179
Offline Mode .................................................................................................................... 180
Review Test .......................................................................................................................... 181
Calibration 183
In this Lesson... ..................................................................................................................... 184
剩余866页未读,继续阅读













安全验证
文档复制为VIP权益,开通VIP直接复制

评论1